Reactive
- Production result
- Soft hand · Grade 4–5 wash
- Fixation route
- Steam at 102–103°C, then multi-stage wash
Manufacturer-direct R2R, DTF and DTG systems matched to your material, sellable output target and finishing workflow.
The fibre determines the chemistry. The chemistry determines fixation, water use and finishing. We qualify that route first, then configure the printer around your fabric and sellable output.
Start with the format you sell. Each route leads to its model, workflow and full specifications.
Direct-to-fabric rolls
For textile mills, fabric rolls and high-output production.
Start with fabric, application or method. The result narrows candidate workflows and machines; final configuration is qualified on your material.
Start with the fabric and fibre composition entering the printer.
Ink chemistry, production workflow and matching model configurations update together.
Choose the finished product to see matching fabrics, inks and printer families.
Tell us the fabric and output target. We send a process route, recommended models and a budget range within one business day.
H·EASY is the brand of Shenzhen Han Leading Technology Co., Ltd.. We are not a reseller. Engineering, assembly, color science and field service are coordinated in Shenzhen, so the printer, ink route and finishing workflow are qualified as one production system. 300+ H·EASY printers now run in factories across 70+ countries, backed by a 42+ patent portfolio. Distributors and large buyers can review our OEM and ODM printer program.
Four checks that continue after the machine leaves the factory.
Printer assembly, color management and line qualification are coordinated in our Shenzhen factory under ISO 9001 procedures.
Every machine completes a 72-hour burn-in and recorded color checks before export packing.
HyCIRC™ white-ink circulation, inline degassing and saved color presets support repeatable daily output.
A 12-month warranty, multilingual remote support, commissioning where required and stocked common parts protect the line after installation.
Use the same inputs when comparing suppliers, speed claims and installed cost.
Tell us about your application, output target and material. We recommend the right model, lead time and budget within one business day.